Dedicated and safe cycle lanes
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, suggests that dedicated and safe cycle lanes are:
Marked-out and clearly signed routes to accommodate building users arriving on and travelling through the assessed site on a bicycle. They must also have the following features:
- Adequate external lighting in accordance with BS 5489-1:2013 Lighting of roads and public amenity areas.
- Appropriate sized, designed and constructed. The following publications offer guidance on how to demonstrate this:
- a) Local transport Note 2/08 Cycle infrastructure design, Department of Transport, 2008
- b) Sustrans design guidance (http://www.sustrans.org.uk), specifically the Sustrans design manual handbook for cycle-friendly design.
[edit] Related articles on Designing Buildings Wiki
- Are electric bikes the future?
- BRE articles.
- BREEAM.
- Building Research Establishment.
- China has just built the world’s longest elevated cycle path.
- Cycle path.
- Cycle storage.
- Cycling and walking plan.
- Dedicated and safe footpaths.
- Designing for cycle traffic.
- Dedicated pedestrian crossing.
- Gearing up for active travel.
- Healthy Streets.
- Highways.
- Integrated transport system.
- Micromobility.
- Pop-up cycle lanes.
- Sustainable transport.
- Sustaining walking and cycling measures after COVID-19.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.